My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 05/08/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 05/08/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:16:14 PM
Creation date
5/3/2012 3:59:07 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
05/08/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. In order to help the City identify new recyclers, the Contractor will send a <br />monthly "Cart Delivered" report to the City. <br />4. All Containers delivered for recycling will have a printed education flyer <br />attached to the lid outlining the details of the Recycling Program. <br />5. The Contractor will meet with the City at least once every quarter to <br />discuss and consider outreach and educational information and materials <br />to romote recycling, target specific Recyclable Materials, and identify <br />p Y g� g p <br />problem materials that are not acceptable. <br />F. The Contractor will provide Containers or equivalent at the City's public works <br />facility delivery for deliver of Recyclable Materials collected by City employees in the <br />City parks and at City events. Size of Containers and frequency of collection will <br />Yp �' <br />match the need. Public "drop-off" will not be allowed. <br />SECTION 4. TERM OF CONTRACT <br />Contract shall be January 1 <br />A. The term of this Co Y 3 2011 through December 31, 2012 <br />(the "Contract Term"). <br />SECTION 5. PREPARATION FOR COLLECTION <br />A. All occupants of Residential Properties in the City will be directed to prepare and <br />store Recyclable Materials in a manner consistent with the Contractor's collection <br />program. <br />B. City residents will be advised that containers in which Recyclable Materials have <br />been stored must be p laced on the boulevard area of the street in front of their <br />residence for collection. Containers must be placed for collection by 6:3 0 am on <br />the scheduled day of collection. <br />C, All Recyclable Materials placed for collection shall be owned -by, and -be the <br />responsibility of, the occupants of each Residential Property until said materials <br />p Y <br />are handled by the Contractor. Upon handling of the Containers and Recyclable Materials by the Contractor, the Recyclable Materials become the property and <br />responsibility of the Contractor. <br />SECTION 6. CONTRACTOR'S EQUIPMENT <br />A. All vehicles used by the Contractor in picking up the Recyclable Materials from <br />the Residential Properties shall be painted and marked uniformly and shall be <br />p <br />identified on both sides of the vehicle. Broom and shovel in good usable <br />condition shall be p laced and maintained on each vehicle. <br />B. The Contractor shall make all collections of Recyclable Materials in vehicles with <br />closed tops on the load portion so that contents will not spill or leak. All of the <br />Contractor's receptacles and vehicles shall be kept clean and as free from <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.