My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/15/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 05/15/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:52 AM
Creation date
5/11/2012 4:08:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 11 <br />149TH LANE <br />ALTERNATIVE 2C - 24" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $800.00 1 $800 <br />2 REMOVE STORM STRUCTURE EACH $400.00 1 $400 <br />3 15" RC PIPE APRON EACH $300.00 1 $300 <br />4 24" RC PIPE APRON EACH $450.00 2 $900 <br />5 24" RC PIPE SEWER DESIGN 3006, CL V - JACKED LIN FT $200.00 118 $23,600 <br />6 CONNECT TO EXISTING STORM SEWER EACH $300.00 1 $300 <br />7 TURF ESTABLISHMENT LUMP SUM $100.00 1 $100 <br />Estimated Construction Cost $26,400 <br />Contingency (1O%) $2,640 <br />Total Estimated Construction Cost $29,040 <br />
The URL can be used to link to this page
Your browser does not support the video tag.