Laserfiche WebLink
TABLE 11 <br />149TH LANE <br />ALTERNATIVE 2C - 24" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $800.00 1 $800 <br />2 REMOVE STORM STRUCTURE EACH $400.00 1 $400 <br />3 15" RC PIPE APRON EACH $300.00 1 $300 <br />4 24" RC PIPE APRON EACH $450.00 2 $900 <br />5 24" RC PIPE SEWER DESIGN 3006, CL V - JACKED LIN FT $200.00 118 $23,600 <br />6 CONNECT TO EXISTING STORM SEWER EACH $300.00 1 $300 <br />7 TURF ESTABLISHMENT LUMP SUM $100.00 1 $100 <br />Estimated Construction Cost $26,400 <br />Contingency (1O%) $2,640 <br />Total Estimated Construction Cost $29,040 <br />