My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 05/15/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 05/15/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:20:52 AM
Creation date
5/11/2012 4:08:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
05/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approximately 1.5 feet. This would, however, increase the HWL in the pond near the <br />clubhouse, which would appear to adversely affect the fairway for Hole # 1 8. <br />The estimated cost to replace the two culverts under the carts paths is $6,642. Table 16 <br />includes the individual costs this alternative. <br />Saturated soil along Hole #15 <br />Another issue is occurring along Hole # 15 near the Rum River. The soil in the area is <br />saturated. There is an existing rock dam, Area 3 on Exhibit 19, southeast of the most <br />saturated area of the fairway. Part of the fairway was excavated to help to determine the <br />problem and drain the area. <br />Based on our review, it appears that the water being contained by the rock dam may be <br />infiltrating into the soil and causing the saturation. There is a dropped of approximately <br />seven feet from the rock dam to the bottom of the downstream channel. We also noticed <br />that the existing drain tile that was excavated along Hole # 15 was plugged with roots and <br />soil. <br />We recommend two alternatives to address the soil saturation along Hole # 15. First, the <br />drain tile should be replaced to improve the drainage in the area. Second, the area of the <br />creek that is being contained by the rock dam should be lined with an impermeable <br />material to eliminate the water infiltrating through the soil. Lining the creek will <br />eliminate the infiltration into the soil and the new drain tile will help to keep the existing <br />soil ry. <br />The estimated cost to replace the drain tile and line the creek bed is $13,530. Table 17 <br />includes individual costs for this alternative. <br />Flooding of Hole #3 and #17 <br />Flooding of Hole #3 and #17 is also an issue at the golf course. The stormwater drains <br />south through three 15" culverts, labeled Area 4A, Area 4B and Area 4C on Exhibit 9, <br />and then to the Rum River. <br />One alternative to lower the HWL's in the area would be to install bigger culverts. A 21" <br />culvert was modeled to replace the culverts at Area 4A and 4B and a 24" culvert was <br />modeled to replace the culvert at 4C. The following table summarizes the 100-year <br />HWL's for the three areas: <br />Existing 100-Year HWL <br />Area 4A Area 4B Area 4C <br />859.3 859.3 858.5 <br />Proposed 100-Year HWL <br />Area 4A Area 4B Area 4C <br />859.1 858.7 <br />858.3 <br />The estimated cost to replace the three culverts is $4,990. Table 18 includes individual <br />costs for this alternative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.