Laserfiche WebLink
TABLE 1 <br />148TH LANE <br />ALTERNATIVE 1A - 15" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $500.00 1 $500 <br />2 CLEARING TREE $100.00 12 $1,200 <br />3 GRUBBING TREE $100.00 12 $1,200 <br />4 REMOVE STORM SEWER LIN FT $5.00 118 $590 <br />5 REMOVE CONCRETE CURB LIN FT $10.00 20 $200 <br />6 REMOVE BITUMINOUS PAVEMENT SQ YD $5.00 23 $115 <br />7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT $3.00 40 $120 <br />8 4" AGGREGATE BASE CLASS 5 SQ Y❑ $7.50 23 $173 <br />9 4" BITUMINOUS PATCH SQ YD $28.00 23 $644 <br />10 BULKHEAD MANHOLE EACH $500.00 1 $500 <br />11 15" RC PIPE APRON EACH $300.00 1 $300 <br />12 TRASH GUARD FOR 15" PIPE APRON EACH $150.00 1 $150 <br />13 CONNECT TO EXISTING STORM SEWER EACH $1,000.00 1 $1,000 <br />14 15" RC PIPE SEWER DESIGN 3006, CL V LIN FT $22.00 152 $3,344 <br />15 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 EACH $1,500.00 1 $1,500 <br />16 CONCRETE CURB & GUTTER DESIGN B618 LIN FT $20.00 20 $400 <br />17 TRAFFIC CONTROL LUMP SUM $300.00 1 $300 <br />18 CONIFEROUS TREE 4' HT B&B TREE $200.00 12 $2,400 <br />19 TURF ESTABLISHMENT ACRE $1,500.00 0.1 $150 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$14,786 <br />$1,479 <br />$16,264 <br />