Laserfiche WebLink
ITEM <br />NO. <br />2 <br />3 <br />4 <br />5 <br />6 <br />DESCRIPTION <br />MOBILIZATION <br />CLEARING <br />GRUBBING <br />COMMON EXCAVATION <br />GRANULAR BORROW <br />TURF ESTABLISHMENT <br />TABLE 7 <br />148TH LANE <br />ALTERNATIVE 3 <br />UNIT <br />LUMP SUM <br />TREE <br />TREE <br />CU YD <br />CU YD <br />ACRE <br />UNIT <br />COST <br />$500.00 <br />$100.00 <br />$100.00 <br />$5.00 <br />$8.00 <br />$1,500.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />10 <br />10 <br />270 <br />1166 <br />0.5 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$500 <br />$1,000 <br />$1,000 <br />$1,350 <br />$9,328 <br />$750 <br />$13, 928 <br />$1,393 <br />$15,321 <br />