My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 02/21/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:19:47 AM
Creation date
5/11/2012 4:13:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Wide Plowing <br />Equipment Costs <br />Single Axle Dump Truck (4) <br />Tandem Axle Dump Truck (2) <br />Motorgrader (1) <br />Wheel Loader (1) <br />1-Ton Pickup (FT Labor) (4) <br />1-Ton Pickup (Temp. Labor) (4) <br />Skidloader/Toolcat (1) <br />Trackless (1) <br />Totals <br />Labor and Equipment Costs <br />Salt <br />Cost to Plow /8 Hour Event+Salt(ST) <br />Cost to plow /8 Hour event+salt (OT) <br />Cost Differential <br />Cost to Plow/Salt Arterials Only <br />City Hall Plowing <br />FEMA Schedule Base FEMA Equipment Schedule <br />Equipment Costs/Hour for Plow Attachments <br />$35.00 <br />$45.00 <br />$58.00 <br />$28.75 <br />$20.00 <br />$20.00 <br />$18.00 <br />$25.00 <br />$249.75 <br />Cost/ton <br />$67.90 <br />$18.50 <br />$18.50 <br />$18.50 <br />$18.50 <br />$10.75 <br />$10.75 <br />$95.50 <br />Salt used/Full Plow <br />35.00 <br />20.00 <br />Holder (1) $25.00 N/A <br />Walk Behind Snowblower $3.25 N/A <br />AN w/plow $7.00 N/A <br />Shoveling <br />Salt/Chemicals for Sidewalks <br />Total Cost /Event <br />
The URL can be used to link to this page
Your browser does not support the video tag.