Laserfiche WebLink
• • <br />SECTION V <br />TRANSPORTATION AND LANDSCAPING <br />17. Park Trail Development and Fees. The City Council has established a trail development fee <br />in the amount of Four Hundred Seventy Five Dollars and no cents ($475.00) per lot, The <br />three (3) existing homesteads are exempt from this fee. The amount of trail fees due on the <br />Plat is Twenty One Thousand Dollars Three Hundred Seventy Five Dollars and no cents <br />($21,375.00) (45 lots x $475.00 per lot). The DEVELOPER herein agrees to construct a <br />sidewalk along one side of the Krypton Street N.W. cul-de-sac to the common property line <br />of Lots 5 and 6 of Block 3. The DEVELOPER also agrees to construct an 8 foot wide <br />bituminous trail along the entirety of the common property line between Lots 5 and 6 of <br />Block 3. The CITY herein agrees to credit the trail development fees due on the Plat in an <br />amount equal to the surface costs associated with the trail and sidewalk segments described <br />in this paragraph. The amount of the credit shall be One Thousand Eight Hundred Sixty <br />Dollars and no cents ($1,860.00). Therefore, a payment in the amount of Nineteen Thousand <br />Five Hundred Fifteen Dollars and no cents ($19,515.00) is due to the CITY for this Plat. <br />The DEVELOPER herein agrees to provide the City with a separate document, in recordable <br />form, granting the City a fifteen foot (15') wide easement for trail and access purposes on the <br />common property line between Lots 5 and 6 of Block 3. <br />18. Sidewalk Construction. The DEVELOPER herein agrees to construct and pave, in <br />accordance with CITY standards, a five foot wide concrete sidewalk with pedestrian <br />ramps in locations prescribed by the CITY, not to exceed 5% in grade, along the east side of <br />Krypton Street N.W., and the south side of 155th Lane N.W. and 154th Lane N.W. The costs <br />associated with sidewalk construction are not eligible as a credit towards the Trail <br />Development Fees and/or Park Dedication requirements due on the Plat. <br />19. Tree and Sod Planting Plan. Sodded boulevards, in addition to yard trees in accordance <br />with the Final Tree Plan dated March 27, 2003, revised April 17, 2003, are required for each <br />lot in the Plat prior to issuance of a Certificate of Occupancy. The DEVELOPER is <br />required to submit a Final Tree Plan for CITY approval that identifies existing tree growth <br />within the Plat that will be protected during construction, and the location and species of the <br />new plantings. The trees to be protected must be identified on the grading plan, and the plan <br />must require the installation of 'tree save fences' prior to land clearing or grading. In <br />addition, the requirement for this Plan shall be fulfilled by the DEVELOPER as follows: <br />a) Minimizing the impact of construction on trees in accordance with Minnesota <br />Extension Service publication "Protecting Trees From Construction Damage" <br />(Publication #N1-FO-6135- ). <br />b) For trees intended to be planted between the sidewalk and the street, the specific <br />locations must be staked in advance of planting and approved by the CITY. In the <br />event the weather is not conducive to tree or planting sod in the boulevard at the time <br />of Certificate of Occupancy, the Building Permit holder shall place a cash deposit in <br />Development AgreernentiWitdlife Sanctuary 3 RD Addition <br />Page 7 of 1 <br />