Laserfiche WebLink
TABLE 6 <br />148TH LANE <br />ALTERNATIVE 2C - 24" OUTLET <br />ITEM <br />NO. <br />DESCRIPTION <br />- <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$900.00 <br />1 <br />$900 <br />2 <br />CLEARING <br />TREE <br />$100.00 <br />2 <br />$200 <br />3 <br />GRUBBING <br />TREE <br />$100.00 <br />2 <br />$200 <br />4 <br />REMOVE STORM SEWER <br />_ LIN FT <br />$4.00 <br />306 <br />$1,224 <br />5 <br />REMOVE CONCRETE CURB <br />LIN FT <br />$5.00 <br />75 <br />$375 <br />6 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$5.00 <br />106 <br />$530 <br />7 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.00 <br />95 <br />$285 <br />8 <br />COMMON EXCAVATION <br />_ <br />CU YD <br />$5.00 <br />100 <br />$500 <br />9 <br />4" AGGREGATE BASE CLASS 5 <br />SQ YD <br />$7.50 <br />106 <br />$795 <br />10 <br />4" BITUMINOUS PATCH <br />SQ YD <br />$28.00 <br />106 <br />$2,968 <br />11 <br />BULKHEAD MANHOLE <br />EACH <br />$500.00 <br />1 <br />$500 <br />12 <br />24" RC PIPE APRON <br />EACH <br />$450.00 <br />2 <br />$900 <br />13 <br />TRASH GUARD FOR 24" PIPE APRON <br />EACH <br />_ <br />$300.00 <br />2 <br />$600 <br />14 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$1,000.00 <br />1 <br />$1,000 <br />15 <br />24" RC PIPE SEWER DESIGN 3006, CL III <br />LIN FT <br />$29.00 <br />334 <br />$9,686 <br />16 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />EACH <br />$1,500.00 <br />1 <br />$1,500 <br />17 <br />CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 <br />LIN FT <br />$2,000.00 <br />2 <br />$4,000 <br />18 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />. <br />$20.00 <br />75 <br />$1,500 <br />19 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$500.00 <br />1 <br />$500 <br />20 <br />CONIFEROUS TREE 4' HT B&B <br />_ TREE <br />$200.00 <br />2 <br />$400 <br />21 <br />TURF ESTABLISHMENT <br />ACRE <br />$1,500.00 <br />r 0.2 <br />_ <br />$300 <br />Estimated Construction Cost <br />Contingency (10%) <br />Permanent Easement ($1.15/ sq ft) <br />Total Estimated Construction Cost <br />$28,863 <br />$2,886 <br />$794 <br />$32,543 <br />