My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 02/21/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:19:47 AM
Creation date
5/11/2012 4:13:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outlet Pipe <br />Size <br />100-Year <br />HWL <br />(658W) <br />100-Year <br />HWL <br />(659W) <br />Estimated Cost <br />Existing <br />862.1 <br />860.4 <br />N/A <br />Existing + 15" <br />861.8 <br />861.2 <br />$15,290 <br />Existing + 18" <br />861.7 <br />861.3 <br />$18,755 <br />Existing + 24" <br />861.6 <br />861.4 <br />$29,040 <br />Tables 9 through 11 include the individual costs for this alternative. <br />As mentioned above, it is our understanding that any work proposed below an elevation <br />of 860 will need the approval of the DNR. This alternative will not have any effect <br />below an elevation of 860 and is not anticipated to need the approval of the DNR. <br />Removing the weir structure and constructing a culvert under TH 47 will require <br />MnIDOT's approval. <br />Alternative 3 <br />Alternative 3 will include removing the existing weir structure and constructing an <br />additional outlet from DNR Wetland 658W under TH 47. The proposed additional outlet <br />would be at an elevation of 859.0, one foot lower than the existing outlet. It was assumed <br />the additional pipe would have to be jacked under TH 47. <br />Two different sized additional outlet pipes were analyzed. The following table <br />summarizes the 100-year HWL's for DNR Wetlands 658W and 659W and the estimated <br />costs to construct each outlet pipe: <br />Outlet Pipe Size <br />100-Year <br />HWL <br />(658W) <br />100-Year <br />HWL <br />(659W) <br />Estimated Cost <br />Existing <br />862.1 <br />860.4 <br />N/A <br />Existing + lower 18" <br />861.6 <br />861.3 <br />$18,755 <br />Existing + lower 24" <br />861.6 <br />861.5 <br />$29,040 <br />Tables 12 and 13 include the individual costs for this alternative. <br />As mentioned above, it is our understanding that any work proposed below an elevation <br />of 860 will need the approval of the DNR. This alternative has work proposed below an <br />elevation of 860 and will need the approval of the DNR. Removing -the weir structure <br />and constructing a culvert under Trunk Highway 47 will require MnIDOT's approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.