Laserfiche WebLink
TABLE 12 <br />149TH LANE <br />ALTERNATIVE 3A - 18" OUTLET <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION, <br />LUMP SUM <br />$500,00 <br />_ <br />1 <br />$500 <br />2 <br />REMOVE STORM STRUCTURE <br />EACH <br />$400.00 <br />1 <br />$400 <br />3 <br />15" RC PIPE APRON <br />_ <br />EACH <br />$300.00 <br />1 <br />$300 <br />4 <br />18" RC PIPE APRON <br />_ <br />EACH <br />$350.00 <br />2 <br />_ <br />$700 <br />5 <br />18" RC PIPE SEWER DESIGN 3006, CL V - JACKED <br />LIN FT <br />$125.00 <br />118 <br />$14,750 <br />6 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />$300.00 <br />. 1 <br />_ <br />$300 <br />7 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />$100.00 <br />; 1 <br />$100 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$17,050 <br />$1,705 <br />$18,755 <br />