My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 02/21/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:19:47 AM
Creation date
5/11/2012 4:13:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
new outlet would be constructed at an elevation of 857.8, two feet lower than the existing <br />outlet. <br />The following table summarizes the 100-year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 14, and Depression 2: <br />Location <br />100-year HWL <br />Depression 1 — Existing <br />864.7 <br />Depression 1 — Proposed <br />864.6 <br />Depression 2 — Existing <br />866.0 <br />Depression 2 — Proposed <br />865.9 <br />The following table summarizes the 100-year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 15, and Depression 2: <br />Location <br />100-year HWL <br />Depression 1 -- Existing <br />864.7 <br />Depression 1 — Proposed <br />864.0 <br />Depression 2 — Existing <br />866.0 <br />Depression 2 — Proposed <br />865.8 <br />As shown, adding this additional outlet pipe has very little effect on the high water levels <br />of the two depressions. One reason for this is that the storm sewer system downstream of <br />Depression 2 is at or above capacity and is flowing back into Depression 2 prior to <br />draining downstream. <br />The estimated cost to construct this additional outlet pipe is $158,609. Table 24 includes <br />the individual costs for this alternative. <br />Alternative 4 <br />Alternative 4 includes constructing an additional 18" outlet pipe from Depression 1. As <br />shown on Exhibit 16, the new outlet pipe would run east from Depression 1 to <br />Depression 2. The new outlet would be constructed at an elevation of 8 5 8.2; 1.6-feet <br />lower than the existing outlet. This alternative assumes that the new outlet from <br />Depression 2, as discussed in Alternative 3, would also be constructed. <br />The following table summarizes the 100-year HWL's for Depression 1, assuming the <br />pond construction shown on Exhibit 14, and Depression 2: <br />Location <br />100-year HWL <br />Depression 1 — Existing <br />864.7 <br />Depression 1 — Proposed <br />864.6 <br />Depression 2 — Existing <br />866.0 <br />Depression 2 — Proposed <br />865.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.