My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/22/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 05/22/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:16:39 PM
Creation date
5/17/2012 6:03:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/22/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sauter & Sons, Inc, <br />Excavating Grading <br />665! 141st Ave. NW, Ramsey, MN 55303 * Phone (763) 421-7919 FAX (163) 411-T797 <br />Conditional Use Permit Infation <br />• Present/planned restarts such as roads, .screening: fencing, equipment etc]. See Plan <br />• Location and acreage of stockpiles, including volume and height of st kpil (both <br />con rett as shall and soils) See Plan <br />• Location of equipment to be used in the crushing operation See Plan <br />• Duration of ;rushing activities 1 Day Set up — 3 days Crushing `early <br />• Percentage of lot coverage related to outside storage (which does include both the <br />stockpiled concretedasphalt and soils) see Plan <br />• Location and species of vegetation for screening purposes See Plan <br />▪ Drainage and erosion control structures Train North to Sedimentation Treatment Pond <br />▪ A play for dust and noise Supply Water during Crushing— Crushing between 7art-5ptn <br />+ Anticipated troffic voIL1rnesfioads to/from the site related to the aggregate and soils <br />prod is 300 Loads per Years <br />• Copies of ill information submitted to the Pollution Control Agency (if required by State <br />rule) related to their permitting (if applicable) <br />1. Sauter & Sons in the course of a year has approximately 300 loads of c ne:re <br />asphalt from our demo & construction jobs, <br />2. Sauter & Sons would like to crush 8c Recycle into 2 different materials for use in <br />construction jobs, 3" minus material for rock entrances & 1,5 " minus for use in <br />future parking lots. <br />3. We would crush materials once a year to limit stockpiling to a minimum and <br />reuse crush material that solo year not to accumulate large stockpiling of either, <br />4. Sauter & Sons would like to be able to Recycle the material to be competitive on <br />our own construction jobs. <br />5, Sauter & Sons it T & G Land Owns 21 acres surrounding the Stockpile Area <br />6, Please call with questions or concerns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.