My WebLink
|
Help
|
About
|
Sign Out
Home
05/24/12
Ramsey
>
Weekly Update
>
2010-2019
>
2012
>
05/24/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2014 1:56:38 PM
Creation date
5/24/2012 5:33:16 PM
Metadata
Fields
Template:
Weekly Update
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• RA -IMG01 issue resolved <br />• Design connection via fiber to ASA in IT room <br />• Resolved issue connecting to RA -CMS <br />• Resolved rights issues in LF <br />• Renewal for AutoCAD <br />• Sound issue in council chambers <br />• Microsoft license renewals <br />• Inventory update <br />Planning <br />• Code Enforcement Inspection on Ramsey Blvd, multiple other code enforcement <br />inspections and follow up <br />• Discussions re: access for potential development west of Armstrong <br />• Coordination of Stoney River pending closing items <br />• Preparation of American Planning Association — Minnesota Chapter Award <br />• Review process for entering code enforcement data <br />• Continued coordination of Comprehensive Plan Amendment details <br />• Review SAC Determination for Subway relocation on TH 47 <br />• Respond to request to allow filming of commercial in Brookfield for Minnesota Lottery <br />• Coordination re: Podawiltz Development documents <br />• Topsoil, tree and landscape inspections <br />• Coordination of IUP info with applicant <br />• Meeting with ACE Solid Waste to discuss recycling contract <br />Finance <br />• Regular and monthly payroll <br />• Prepare letters to tenants of city leased property regarding new contact information <br />• Research mapping of LOGIS with PDS to update records <br />• CAFR -2 " Draft sent to MMKR for Review <br />• F &C Performance Bond <br />• Prepare 2013 budget request document with departmental line items <br />• Print checks from 5 -22 -12 CC meeting approval <br />• Prepared Nextel bill for routing <br />• New water meter set up with OPUS <br />• Journal entry fuel chargebacks <br />• Cash receipts /AR/AP <br />Engineering <br />• Preparation and attendance of City Council meeting <br />• Meeting with MnDOT to discuss Sunwood Drive realignment; inclusion in MSA system <br />& future funding <br />• Property owner meetings to discuss pending storm sewer improvement projects (securing <br />easements) <br />• Discussed implications of municipal parking ramp change order request (canopy vs. <br />sign); initial MnDOT response was not favorable <br />• Updated sealcoat specifications in preparation of advertising for bid on 2012 Street <br />Maintenance Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.