My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/07/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 11/07/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:21:07 PM
Creation date
6/1/2012 11:49:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/07/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2011 <br />Jason and Ruth Obermaier <br />5220 156" Lane NW <br />Ramsey, MN 55303 <br />7550 Sunwood Drive NW • Ramsey, Minnesota 55303 <br />City Hall: 763-427-1410 a Fax: 763-427-5543 <br />www.ci.ratnsey.nu1.us <br />Re: Letter of Understanding - Septic Replacement <br />Dear Mr. and Mrs. Obermaier, <br />As previously discussed with you, this letter outlines our agreement related to the relocation of the sanitary septic <br />system on your property located at. 5220 156th Lane NW. The City of Ramsey will be preparing the final design and <br />construction documents for you so that you may administer the project and contract directly with a contractor of your <br />choice. This project entails the following: <br />• Relocation of the existing septic drain field. <br />• Tree removal as necessary to complete the project. <br />• Relocation of existing shrubs, as shown on the design, to the west property line to provide screening. <br />• Grading work to fill the depression at the rear of your property to alleviate the drainage concerns in that area. <br />• Relocation and/or repair of your existing irrigation system to facilitate this project. <br />• Final turf establishment in all areas disturbed by the construction activities. <br />The City will be responsible for the technical inspections and oversight during installation of the septic facilities, and <br />will bear the cost of all these improvements. You will be required to administer the items related to final grading and <br />turf establishment directly with the contractor, such that it meets your satisfaction. Following completion and <br />acceptance the City will have no further obligation related to this matter. <br />Attached to this letter is the septic design, which has been prepared by Landform Engineering and is the basis for the <br />work related to this project. By signing this letter you acknowledge the facts and obligations stated above, and agree <br />that there will be no further recourse against the City as it relates to this work. Please feel free to contact me directly if <br />you have any questions or concerns related to this matter, and thank you for your patience and cooperation through this <br />process. <br />Sincerely, <br />C <br />K�M' � <br />Brian Olson, PE . <br />Public Works Director/Principal City Engineer <br />Jason Obermaier Ruth Obermaier <br />
The URL can be used to link to this page
Your browser does not support the video tag.