My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/07/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 11/07/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:21:07 PM
Creation date
6/1/2012 11:49:23 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/07/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />1- A D F ® R M <br />From Site to Finish <br />105 South Fifth Avenue Tel: 612-252-9070 <br />Suite 513 Fax: 612-252-9077 <br />Minneapolis, MN 55401 www,landform.net <br />10/4311 <br />5220 156" Lane NW <br />Ramsey,Mn, <br />Thank you for asking us to provide a septic design for your project in Ramsey. We have successfully <br />completed projects of similar nature in the past and have the expertise to meet and exceed your <br />expectations for this project. <br />We have estimated/designed a new, standard septic system (Type 1) for a 4 -bedroom house. The <br />details of this system are outlined within the project scope as follows. <br />• Design is to replace flooded trenches in rear lower yard. <br />Existing system is non compliant due to lack of vertical separation. <br />• Pump and ,reuse existing compliant 1250 gallon septic tank.. <br />• Install 1500 gallon reverse flow tank use 1000 gallon end for lift tank with pump and indoor <br />alarm. Install in lower west end of yard below pool elevation. This, may require a water proofed <br />tank and dewatering. <br />• Use dropbox distribution of effluent. Pump to highest dropbox. <br />• Use schedule 40 piping throughout pressure distribution system. <br />Verify all well and property line setbacks. <br />• As part of the scope of this project and to ensure quality control, we will divert water from <br />system's surroundings on final grade, rope off the new septic site, keep all construction traffic <br />off of the site before and after construction. <br />Sincerely, <br />Landform <br />Michael Jun'gbauer, The Septic Docto—r`111�—.. <br />MPCA License No. L3227 <br />Londform", Sensibly ` and Site to Ffnlsh" am sorvioo marks of LanClonn Erglnoodng Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.