Laserfiche WebLink
ITEM <br />NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />TABLE 27 <br />SODIUM STREET <br />ALTERNATIVE 1 <br />DESCRIPTION <br />MOBILIZATION <br />REMMOVE STORM SEWER <br />REMOVE CONCRETE PAVEMENT <br />REMOVE BITUMINOUS PAVEMENT <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />COMMON EXCAVATION <br />4" AGGREGATE BASE CLASS 5 <br />4" BITUMINOUS PAVEMENT <br />4" CONCRETE DRIVEWAY PAVEMENT <br />15" METAL APRON <br />12" RC PIPE APRON <br />15" CP PIPE SEWER <br />12" RC PIPE SEWER DESIGN 3006, CL V <br />TRAFFIC CONTROL <br />TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />LIN FT <br />SQ YD <br />SQ YD <br />LIN FT <br />CU YD <br />SQ YD <br />SQ YD <br />SQ YD <br />EACH <br />EACH <br />LIN FT <br />LIN FT <br />LUMP SUM <br />ACRE <br />UNIT <br />COST <br />$300.00 <br />$5.00 <br />$6.00 <br />$5.00 <br />$3.00 <br />$6.00 <br />$7.50 <br />$28.00 <br />$13.00 <br />$225.00 <br />$275.00 <br />$20.00 <br />$20.00 <br />$1,000.00 <br />$1,500.00 <br />TOTAL TOTAL <br />ESTIMATED ESTIMATED <br />QUANTITY COST <br />1 <br />25 <br />45 <br />49 <br />44 <br />400 <br />94 <br />49 <br />45 <br />2 <br />4 <br />44 <br />40 <br />1 <br />0.5 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$300 <br />$125 <br />$270 <br />$245 <br />$132 <br />$2,400 <br />$705 <br />$1,372 <br />$585 <br />$450 <br />$1,100 <br />$880 <br />$800 <br />$1,000 <br />$750 <br />