Laserfiche WebLink
ITEM <br />NO. <br />1 MOBILIZATION <br />2 COMMON EXCAVATION <br />3 GRANULAR BORROW <br />4 TURF ESTABLISHMENT <br />DESCRIPTION <br />TABLE 14 <br />149TH LANE <br />ALTERNATIVE 4 <br />UNIT <br />LUMP SUM <br />CU YD <br />CU YD <br />ACRE <br />UNIT <br />COST <br />$100.00 <br />$5.00 <br />$8.00 <br />$1,500.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />133 <br />380 <br />0.3 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$100 <br />$665 <br />$3,040 <br />$450 <br />$4.255 <br />$426 <br />$4,681 <br />