Laserfiche WebLink
TABLE 15 <br />RUM RIVER HILLS GOLF CLUB <br />FLOODING AR❑UND HOLE #1 - NEW OUTLET STRUCTURE <br />ITEM <br />NO. DESCRIPTION <br />1 MOBILIZATION <br />2 CLEARING <br />3 GRUBBING <br />4 REMOVE STORM SEWER <br />5 18" METAL APRON <br />6 18" RC PIPE APRON <br />7 18' H❑PE PIPE SEWER <br />R <br />8 18" RC PIPE SEWER DESIGN 3006, CL III <br />9 OUTLET CONTROL STRUCTURE <br />10 TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />ACRE <br />ACRE <br />LIN FT <br />EACH <br />EACH <br />LIN FT <br />LIN FT <br />EACH <br />ACRE <br />UNIT <br />COST <br />$800.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />$1,500,00 <br />$1,500.00 <br />$1.50 <br />$275.00 <br />$350.00 <br />$22.00 <br />$23.00 <br />$4,000.00 <br />$1,500.00 <br />0.2 <br />0.2 <br />856 <br />1 <br />1 <br />850 <br />10 <br />1 <br />0.6 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTI MATED <br />COST <br />$800 <br />$300 <br />$300 <br />$1,284 <br />$275 <br />$350 <br />$18,700 <br />$230 <br />$4,000 <br />$900 <br />$27,139 <br />$2,714 <br />$29,853 <br />