Laserfiche WebLink
TABLE 17 <br />RUM RIVER HILLS GOLF CLUB <br />HOLE #15 SATURATION - CREEK LINING AND DRAIN TILE <br />ITEM <br />NO. <br />1 MOBILIZATION <br />2 4" PERF PIPE DRAIN <br />3 CREEK LINING <br />4 TURF ESTABLISHMENT <br />DESCRIPTION <br />UNIT <br />LUMP SUM <br />LIN FT <br />LUMP SUM <br />LUMP SUM <br />UNIT <br />COST <br />$350.00 <br />$15.00 <br />$5.000,00 <br />$200.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />450 <br />1 <br />1 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$350 <br />$6,750 <br />$5,000 <br />$200 <br />$12,300 <br />$1,230 <br />$13,530 <br />