Laserfiche WebLink
TABLE 5 <br />148TH LANE <br />ALTERNATIVE 2B - 18" OUTLET <br />ITEM <br />NO. DESCRIPTION <br />1 MOBILIZATION <br />2 CLEARING <br />3 GRUBBING <br />4 REMOVE STORM SEWER <br />5 REMOVE CONCRETE CURB <br />6 REMOVE BITUMINOUS PAVEMENT <br />7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />8 COMMON EXCAVATION <br />9 4" AGGREGATE BASE CLASS 5 <br />10 4" BITUMINOUS PATCH <br />11 BULKHEAD MANHOLE <br />12 18' RC PIPE APRON <br />13 TRASH GUARD FOR 18' PIPE APRON <br />14 CONNECT TO EXISTING STORM SEWER <br />15 18" RC PIPE SEWER DESIGN 3006, CL III <br />16 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />17 CONCRETE CURB & GUTTER DESIGN B618 <br />18 TRAFFIC CONTROL <br />19 CONIFEROUS TREE 4" HT B&B <br />20 TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />TREE <br />TREE <br />LIN FT <br />LIN FT <br />SQ YD <br />LIN FT <br />CU YD <br />SQ YD <br />SQ YD <br />EACH <br />EACH <br />EACH <br />EACH <br />LIN FT <br />EACH <br />LIN FT <br />LUMP SUM <br />TREE <br />ACRE <br />TOTAL TOTAL <br />UNIT ESTIMATED ESTIMATED <br />COST QUANTITY COST <br />$500.00 1 $500 <br />$100.00 2 $200 <br />$100.00 2 $200 <br />$5.00 153 $765 <br />$10.00 55 $550 <br />$5.00 61 $305 <br />$3.00 75 $225 <br />$5.00 100 $500 <br />$7.50 61 $458 <br />$28.00 61 $1,708 <br />$500.00 1 $500 <br />$350.00 1 $350 <br />5200.00 1 $200 <br />$1.000.00 2 $2,000 <br />$23.00 187 $4,301 <br />$1,500.00 1 $1,500 <br />$20.00 55 $1,100 <br />$500.00 1 $500 <br />$200.00 2 $400 <br />$1,500.00 0.1 $150 <br />Estimated Construction Cost <br />Contingency (10%) <br />Permanent Easement ($1.15/ sq ft) <br />Total Estimated Construction Cost <br />$16,412 <br />$1,641 <br />$794 <br />$18.846 <br />