My WebLink
|
Help
|
About
|
Sign Out
Home
06/12/12
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2012
>
06/12/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:15:37 AM
Creation date
6/11/2012 8:44:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
06/12/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 5 <br />148TH LANE <br />ALTERNATIVE 2B - 18" OUTLET <br />ITEM <br />NO. DESCRIPTION <br />1 MOBILIZATION <br />2 CLEARING <br />3 GRUBBING <br />4 REMOVE STORM SEWER <br />5 REMOVE CONCRETE CURB <br />6 REMOVE BITUMINOUS PAVEMENT <br />7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />8 COMMON EXCAVATION <br />9 4" AGGREGATE BASE CLASS 5 <br />10 4" BITUMINOUS PATCH <br />11 BULKHEAD MANHOLE <br />12 18' RC PIPE APRON <br />13 TRASH GUARD FOR 18' PIPE APRON <br />14 CONNECT TO EXISTING STORM SEWER <br />15 18" RC PIPE SEWER DESIGN 3006, CL III <br />16 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 <br />17 CONCRETE CURB & GUTTER DESIGN B618 <br />18 TRAFFIC CONTROL <br />19 CONIFEROUS TREE 4" HT B&B <br />20 TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />TREE <br />TREE <br />LIN FT <br />LIN FT <br />SQ YD <br />LIN FT <br />CU YD <br />SQ YD <br />SQ YD <br />EACH <br />EACH <br />EACH <br />EACH <br />LIN FT <br />EACH <br />LIN FT <br />LUMP SUM <br />TREE <br />ACRE <br />TOTAL TOTAL <br />UNIT ESTIMATED ESTIMATED <br />COST QUANTITY COST <br />$500.00 1 $500 <br />$100.00 2 $200 <br />$100.00 2 $200 <br />$5.00 153 $765 <br />$10.00 55 $550 <br />$5.00 61 $305 <br />$3.00 75 $225 <br />$5.00 100 $500 <br />$7.50 61 $458 <br />$28.00 61 $1,708 <br />$500.00 1 $500 <br />$350.00 1 $350 <br />5200.00 1 $200 <br />$1.000.00 2 $2,000 <br />$23.00 187 $4,301 <br />$1,500.00 1 $1,500 <br />$20.00 55 $1,100 <br />$500.00 1 $500 <br />$200.00 2 $400 <br />$1,500.00 0.1 $150 <br />Estimated Construction Cost <br />Contingency (10%) <br />Permanent Easement ($1.15/ sq ft) <br />Total Estimated Construction Cost <br />$16,412 <br />$1,641 <br />$794 <br />$18.846 <br />
The URL can be used to link to this page
Your browser does not support the video tag.