My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 07/10/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:20:01 PM
Creation date
7/10/2012 10:44:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />cY ANwciulcs. Inc. <br />June 14, 2012 <br />Engineering • Planning • Environmental • Construction <br />Mr. Tim Himmer, PE <br />City Engineer <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />RE: Sunwood/Armstrong Construction Services <br />Dear Tim, <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />This letter is WSB's revised proposal to provide surveying, construction administration, and inspection <br />services for the relocated Sunwood Drive and Armstrong Boulevard improvements. This proposal <br />assumes that the two projects are bid as a single project and is based on a construction start date of July <br />9th and completion of the construction in 2012. The proposed scope of services includes the project <br />engineering, construction staking, construction administration, inspection, and record plans for both the <br />Sunwood Drive and Armstrong Boulevard improvements. The revised proposal has been broken into <br />four work tasks as requested by the City. Although the cost breakdown by task is different than the <br />previous submittals because of the revised task descriptions, the total cost is consistent with the <br />previous submittals. A description of the four work tasks is presented below: <br />1. Project Engineering — Provide interpretation of plans and specifications, shop drawing reviews, <br />attend weekly construction meetings and onsite construction meetings as necessary, for the <br />Sunwood Drive and Armstrong Boulevard projects. WSB will coordinate with Landform, if <br />necessary, on the construction plans they prepared. <br />2. Construction Staking — Provide survey control and construction staking for the Sunwood Drive <br />and Armstrong Boulevard projects. Obtain information necessary for the preparation of record <br />plans. <br />3. Contract Administration and Inspection — Administer the overall contract for both the Sunwood <br />Drive and Armstrong Boulevard projects. This includes preparing pay requests and change <br />orders, and providing construction inspection services in coordination with the City. This also <br />includes coordination of utility relocations in the corridor. <br />4. Record Plans — Prepare record plans for the Sunwood Drive and Armstrong Boulevard projects. <br />Project closeout items are also included in this task. <br />The following table presents a summary of the estimated costs for the identified work tasks. WSB would <br />complete this work under our existing Engineering Services Contract with the City of Ramsey. The work <br />will be billed on an hourly basis based on standard hourly rates as identified in our existing contract with <br />Minneapolis • St. Cloud <br />Equal Opportunity Employer <br />N'.\01973-010\Adman\Contract \ Letter to the City of Ramsey for Sonwootl antl Armstrong Improvements.tlow <br />
The URL can be used to link to this page
Your browser does not support the video tag.