My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/10/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 07/10/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:20:01 PM
Creation date
7/10/2012 10:44:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SERVICES TO BE PERFORMED BY CONSULTANT <br />1. Project Engineering — Provide interpretation of plans and specifications, shop drawing <br />reviews, attend weekly construction meetings and onsite construction meetings as necessary, <br />for the Sunwood Drive and Armstrong Boulevard projects. WSB will coordinate with <br />Landform, if necessary, on the construction plans they prepared. <br />2. Construction Staking — Provide survey control and construction staking for the Sunwood <br />Drive and Armstrong Boulevard projects. Obtain information necessary for the preparation <br />of record plans. <br />3. Contract Administration and Inspection — Administer the overall contract for both the <br />Sunwood Drive and Armstrong Boulevard projects. This includes preparing pay requests <br />and change orders, and providing construction inspection services in coordination with the <br />City. This also includes coordination of utility relocations in the corridor. <br />4. Record Plans — Prepare record plans for the Sunwood Drive and Armstrong Boulevard <br />projects. Project closeout items are also included in this task. <br />
The URL can be used to link to this page
Your browser does not support the video tag.