My WebLink
|
Help
|
About
|
Sign Out
Home
07/31/12 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2012
>
07/31/12 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:16:55 AM
Creation date
7/26/2012 4:01:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority - Special
Document Date
07/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HRA Special Session <br />Meeting Date: 07/31/2012 <br />By: Darren Lazan, Housing & <br />Redevelopment Authority <br />Information <br />5. 3. <br />Title: <br />Approve additional services for utility design related to Bunker Lake Blvd. Storm Crossing <br />Background: <br />The original storm sewer system in the area north of Bunker Lake Boulevard in The COR was designed and <br />installed as part of the original improvements for the area. The design for this area contemplates the storm water <br />flowing through a large pipe under Bunker Lake Boulevard and into the larger system in The COR. <br />Since this area was developed prior to the ponds that will ultimately receive that water, a pipe was stubbed under <br />Bunker for future connection, and a temporary pond constructed on the triangle parcel north of Bunker. <br />As part of the North Commons plat, it was anticipated that we would make a connection to this system, and simply <br />extend the stubbed pipe to the newly excavated Lake Ramsey. <br />Unfortunately, when the pipe was stubbed under Bunker it was not extended completely to the south side of the <br />road, and it will be necessary to close Bunker and excavate under the roadway to complete this system. <br />Notification: <br />Observations: <br />Attached is a work order for the additional plans necessary to complete this work. This includes a plan for the <br />actual piping, modification to existing water lines, and a road closure plan necessary to complete the work. <br />Recommendation: <br />The development team recommends we complete the design work and prepare the plans necessary to complete this <br />work. It is recommended that the actual work be completed this fall following the opening of Sunwood Drive. <br />Plans will be sent to the current Sunwood Drive contractor for pricing, and re -presented to both the HRA and CC <br />for approval prior to construction. It is further proposed that the HRA assume the costs of the design and <br />documentation, but the construction costs be included in the current Sunwood Drive reallocation project as part of <br />the construction of Lake Ramsey. <br />Funding Source: <br />Sunwood Drive Construction Project Budget. <br />Council Action: <br />Approve the attached work order for the preparation of plans for the extension of storm sewer to Lake Ramsey. <br />Attachments <br />Work Order <br />
The URL can be used to link to this page
Your browser does not support the video tag.