My WebLink
|
Help
|
About
|
Sign Out
Home
08/13/12
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2012
>
08/13/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:17:11 AM
Creation date
8/9/2012 4:12:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
08/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HRA Regular Session <br />Meeting Date: 08/13/2012 <br />By: Darren Lazan, Housing & <br />Redevelopment Authority <br />5. 2. <br />Information <br />Title: <br />Consider Award of Construction Project - North Commons <br />Background: <br />At the regular meeting of the HRA on July 10, 2012, the HRA approved plans and specifications for North <br />Commons, the 17 lot subdivision on HRA property. This work consists of the grading, utilities, street, and storm <br />sewer improvements necessary to develop the proposed property. <br />When plans and specifications were ordered, the project scope was used to develop a pro -forma which was <br />presented to the HRA for approval. This pro -forma contemplates the cost of development, city development fees, <br />and proceeds remaining for the HRA. This pro -forma was approved by the HRA and contemplated a break-even <br />proposition for the HRA at an average lot price of $35,000. This presumes all development costs and development <br />fees were paid to the city, and the HRA received their land costs back from the sale of these lots. <br />The first of these lots is under contract for sale at $35,000. <br />Bids were received and opened Tuesday August 7th, 2012. Three contractors bid the project. One contractor bid <br />all 8 sections of the proposed work, while two other contractors combined to cover all 8 sections. The apparent low <br />bid was in the amount of $461,752.00 and was proposed by Dave Perkins and Sauter and Sons. The pro -forma <br />estimate for construction costs was roughly $330,000. The $160,000 difference can be accounted for in a couple <br />significant components. <br />During the review of the plans by LRRWMO, they requested our project meet the new requirements of the <br />Generation 3 plan which would have added considerable cost to the project. While we were able to negotiate a <br />reasonable solution, there were still items added to the plans that were not contemplated in the original approvals <br />for this area, or in the original pro -forma. <br />• The addition of an outlet pipe from the existing North Commons pond. <br />• Additional fill to create a greater separation from the high water elevation. <br />• Modifications to the existing storm water system. <br />There were additional costs for grading and import of material due to proximity to the site. The original pro -forma <br />contemplated material available for this project from the area now excavated as Lake Ramsey. When the HRA <br />agreed to allow that material to be used for fill on BOTH Armstrong Boulevard and Sunwood Drive we depleted <br />the available material. We will now open a second borrow area east of the tree line and west of proposed Center <br />Street. There were higher grading costs associated with that effort. <br />Finally, the project is carrying both the initial contribution for the park construction, as well as the additional costs <br />associated with the soil corrections approved by the HRA. This is currently approximately $40,000. <br />Notification: <br />Observations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.