My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/13/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 08/13/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:21:30 PM
Creation date
8/10/2012 8:36:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/13/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 1. <br />Meeting Date: 08/13/2012 <br />Submitted For: Shane Nelson By: Shane Nelson, Engineering/Public Works <br />Information <br />Title: <br />City Improvement Project 12-20; Sunwood Drive Realignment - Consider Change Order #1 <br />Background: <br />On June 26, 2012 the City Council awarded a contract to North Pine Aggregate for City Improvement Project <br />12-20; Sunwood Drive Realignment. The construction plans for this project identified an existing 65" x 92" <br />Reinforced Concrete Arch Pipe stub out of Structure 5004 that was constructed with the original improvements for <br />Sunwood Drive. Structure 5004 is located in the old alignment of Sunwood Drive, approximately 500 feet west of <br />Zeolite, and will be entirely within the proposed COR TWO plat. The purpose of the stub was to serve future <br />development when needed. The construction plans have recently been submitted for the COR TWO plat and the <br />storm sewer stub discussed herein is not proposed to be utilized, therefore, the stub should be permanently <br />abandoned or removed. Abandoning the pipe will consist of installing blow pipes on both sides, filling the pipe full <br />of sand and bulk -heading at the structure. <br />The construction project also included the partial excavation of Lake Ramsey. We have been informed that the <br />excavation area was subject to extensive uncontrolled fill by a number of parties over the years. The fill included <br />stockpiles of clay, street sweepings, sod chunks, and other mixed materials. We have further been informed that <br />this issue was discussed with the former City Engineer during the mass grading effort and it was concluded that <br />extensive testing and mapping would be necessary to identify and quantify the uncontrolled fill. The costs of the <br />mapping and testing were presumed to be in excess of the costs that would be incurred by simply dealing with the <br />material in the field with the Contractor, and the design engineer proceeded accordingly. The design engineer has <br />reviewed this Change Order request and recommends approval to compensate the Contractor for unforeseen <br />conditions. <br />Observations: <br />In relation to the Abandon Arch Pipe at Structure 5004 Change Order item - Additional expense would be <br />incurred if the City were to consider removal of the pipe. The additional expense would include costs for <br />dewatering and rebuilding/replacing the 12' diameter manhole. The estimated cost savings for abandoning <br />vs. removing the pipe is $15,000 - $20,000. <br />In relation to the Additional Topsoil Excavation and Handling Change Order item - this item will compensate the <br />Contractor for additional work already performed that was outside of the scope of the original contract. The <br />proposed Change Order unit price was obtained through negotiations with the Contractor and is a fair price for the <br />additional work. <br />Recommendation: <br />Staff recommends approving Change Order #1 in the amount of $19,237.60. <br />Funding Source: <br />The funding package for this project has been previously identified. <br />Council Action: <br />Motion to approve proposed Change Order #1 in the amount of $19,237.60 for City Improvement Project #12-20; <br />Sunwood Drive Realignment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.