My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/13/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 08/13/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:21:30 PM
Creation date
8/10/2012 8:36:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/13/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn/DOT TP-2184-02 (5/83) <br />State of Minnesota Department of Transportation <br />Page 1 of 1 <br />CHANGE ORDER #1 <br />Contractor: North Pine Aaareaate. Inc. S.P. No. 199-020-010, 199-104-010 <br />Address: 14551 Lake Drive <br />Forest I eke MN 55025 <br />Location: CSAH 83 and 147th Avenue/Sunwood Drive Project <br />F.P. No. N/A <br />Contract No. N/A <br />In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions: <br />Abandon existing arch pipe at structure 5004, additional topsoil excavation and handling for <br />stockpiles/dump sites in the vicinity of Lake Ramsey. <br />ESTIMATE OF COST <br />Added Items <br />ITEM <br />NO. ITEM NAME UNIT QUANTITY UNIT PRICE AMOUNT <br />1 Abandon Arch Pipe at Structure 5004 LS 1 $ 5,335.00 $ 5,335.00 <br />2 Additional Topsoil Excavation and Handling CY 5,452 $2.55 $13,902.60 <br />Original Contract Amount <br />Change in Contract due to this Change Order <br />Total Contract Amount <br />Issued by: <br />Approved by: <br />Accepted by: <br />CHANGE IN CONTRACT TIME <br />Due to this change, the Contract Time: <br />❑ is Increased by Li Working Days <br />❑ is Decreased by ❑ Calendar Days <br />• is not changed. <br />❑ May be revised if the work affected the controlling <br />operation. <br />$2,342,641.29 <br />$19,237.60 <br />$2,361,878.89 <br />City Engineer <br />City Administrator <br />Date <br />Date <br />Contractor's Authorized Representative Date <br />I:\AgendaQuick\Documents\Engineering\Sunwood Change Order No 1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.