My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/13/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 08/13/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:21:30 PM
Creation date
8/10/2012 8:36:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/13/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Organization has been obtained; (e) a Permit from Anoka County Soil Conservation <br />District has been obtained (if necessary); and (f) this Contract has been signed and <br />received by the CITY. <br />b. No occupancy permit for any lot in the Plat shall be issued until: (a) vehicular access <br />to the lot is provided, including the installation of at least one layer of bituminous <br />surfacing; (b) all utilities are in place, operational and accepted by the CITY; (c) for <br />lots that have a slope of less than 2%, a certificate of grading, prepared by a licensed <br />(State of Minnesota) professional land surveyor, must be provided to the CITY <br />documenting that the flattest grade on this lot is 1% or greater; and (d) boulevard sod <br />and landscape tree, or escrow for same, have been provided. <br />c. Payment of Development Fees. <br />17. Park Dedication. The PERMITTEE is responsible for satisfying Park Dedication <br />requirements. The 2012 Park Dedication Fee is $4,738 per commercial area of net <br />developable area. You will be responsible for a payment of Eighteen Thousand Seven <br />Hundred Sixty Two Dollars and No Cents ($2,475 x 3.96 acres = $18,762.00). The rate in <br />effect at the time of execution of this Contract will be collected. <br />18. Trail Development Fees. The PERMITTEE development is responsible for satisfying Trail <br />Development Fee requirements. The 2012 Trail Development Fee is $1,090 per commercial <br />area of net developable area. You will be responsible for a payment of Four Thousand Three <br />Hundred Sixteen Dollars and No Cents ($600 x 3.96 acres = $4,316.00). The rate in effect at <br />the time of execution of this Contract will be collected. <br />19. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />Sanitary Sewer Trunk Fee requirements. The 2012 Sewer Truank Fee is $3,824 per <br />commercial area of net developable area. You will be responsible for a payment of Fifteen <br />Thousand One Hundred Forty Three Dollars and No Cents ($1,271 x 3.96 acres = <br />$15,143.00). The rate in effect at the time of execution of this Contract will be collected. <br />20. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying Water <br />Trunk Fee requirements. The 2012 Water Trunk Fee is $8,337 per commercial area of net <br />developable area. You will be responsible for a payment of Thirty Three Thousand Fifteen <br />Dollars and No Cents ($2,226 x 17 units = $33,015.00). The rate in effect at the time of <br />execution of this Contract will be collected. <br />21. Sanitary Sewer Lateral Fees. The PERMITTEE is responsible for satisfying Sanitary Sewer <br />Lateral Fee requirements as the newly constructed units will be connecting to existing <br />infrastructure. The 2012 Sanitary Sewer Lateral Fee is $3,847 per connection. You will be <br />responsible for a payment of Eleven Thousand Five Hundred Forty One Dollars and No <br />Cents ($3,847 x 3 connections = $11,541.00). The rate in effect at the time of execution of <br />this Contract will be collected. The actual construction costs to extend private services from <br />existing connection points may be elegible for credit to lateral fees. <br />22. Water Lateral Fees. The PERMITTEE is responsible for satisfying Water Lateral Fee <br />requirements as the newly constructed units will be connecting to existing infrastructure. The <br />2012 Water Lateral Fee is $8,777 per connection. You will be responsible for a payment of <br />Twenty Six Thousand Three Hundred Thirty One Dollars and No Cents ($8,777 x 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.