My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/28/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 08/28/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:22:14 PM
Creation date
8/24/2012 11:46:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/28/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 1. <br />Meeting Date: 08/28/2012 <br />By: Len Linton, Engineering/Public Works <br />Information <br />Title: <br />Consider Award of Bid for City Project #12-23; SAP 199-107-009 Alpine Drive Reconstruction <br />Background: <br />Staff presented the outline for the Alpine Drive overlay project to the City Council in March 2011. Due to funding <br />constraints, pavement condition along the extent of the roadway and the pending Anoka County signalization <br />project, it was decided to break the project into two segments. The first segment from Ramsey Boulevard to the <br />skate park (at Alpine Park) was constructed in 2011. <br />The second segment from the skate park to Sunfish Lake Boulevard was discussed at the the March 2012 Public <br />Works Committee Meeting. Alternative paving technologies and pedestrian connection options were discussed. <br />The Committee recommendation to the City Council was that the alternative paving technologies not be used on <br />this segment and that a pedestrian segment on the south side of Alpine Drive be included as an Add Alternate to the <br />contract. <br />Plans and specifications for the reconstruction of Alpine Drive from the skate park area to Sunfish Lake Boulevard <br />and construction of a 10' foot bituminous sidewalk from Hematite Street to the park as an Add Alternate were <br />received by City Council at the July 24, 2012 meeting and were authorized for bid. <br />Observations: <br />Bids were received and opened on Friday, August 24, 2012 at 10:00 am. Staff has tabulated and summarized the <br />bids as noted below: <br />Contractor <br />Bid <br />Alternate <br />Total <br />North Valley, Inc <br />$ 229,950.54 <br />$ 42,770.77 <br />$ 272,721.31 <br />Knife River <br />$ 233,261.02 <br />$ 44,537.05 <br />$ 277,793.07 <br />Hardrives, Inc. <br />$ 249,858.55 <br />$ 44,454.22 <br />$ 294,312.78 <br />North Valley, Inc is the low bidder. They were the contractor for 2011 Alpine Drive reconstruction project from <br />Ramsey Boulevard to the skate park. <br />Recommendation: <br />Staff recommends awarding the bid to North Valley, Inc. in the amount of $ 229,950.54 base bid and <br />$ 42,770.77 add alternate for a total of $ 272,721.31. The engineers estimate was $295,000, broken down as <br />roadway $255,000 and bituminous sidewalk at $40,000 respectively. <br />Funding Source: <br />This project is eligible to be funded with the City's Minnesota State Aid (state gas tax) fund, but as previously <br />discussed, MSA funds become limited in future years due to the current MSA street improvement projects in <br />progress. This project was included in the 2012-17 Capital Improvement Program as being funded from Tax <br />Increment Financing District #4 (TIF #4) This project is TIF eligible as it is south of Alpine Drive (DD#1) and a <br />public improvement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.