Laserfiche WebLink
TABLE OF CONTENTS <br />1 <br />le of Contents <br />Section 1. Identification and Qualifications of Assigned Personnel 1 <br />A. Staff Commitment 1 <br />B. Interim City Engineer 1 <br />C. Other Personnel 2 <br />Section 2. Approach to Scope of Services ... 3 <br />A. Introduction 3 <br />B. Interim City Engineer 3 <br />C. Project Management 3 <br />D. Construction Services 4 <br />E. Preparation of Engineering Reports and Technical Correspondence 4 <br />F. Participate in City Meetings 4 <br />G. Respond to Constituent Requests and Issues 5 <br />H. Other Items 5 <br />Section 3. Basis for Compensation 5 <br />A. Interim City Engineering Services 5 <br />B. Project Work 6 <br />Section 4. List of References 7 <br />APPENDIX <br />A. Detailed Resumes <br />lir <br />A <br />Table of Contents <br />