Laserfiche WebLink
I <br />B. Project Work <br />For project work a not -to -exceed cost would be developed based on the hourly rates shown below. For <br />these not -to -exceed services, a proposal letter would be prepared for approval by the City. We would <br />invoice at our hourly billing rates with a maximum fee set by the approved proposal. For the year 2012 <br />our hourly billing rates for all service types by job classification are proposed as follows: <br />Job Classification <br />Principal Engineer or Principal Surveyor <br />Project Manager <br />Design Engineer <br />Senior Technician <br />Technician <br />Senior Construction Observer <br />Construction Observer <br />1 Person Survey Crew with Robotic or GPS <br />2 Person Survey Crew <br />3 Person Survey Crew <br />Administrative Assistant <br />Hourly Billing Rate <br />$115 <br />$80 - $110 <br />$65 - $105 <br />$65 - $90 <br />$50 - $65 <br />$65 - $90 <br />$45 - $65 <br />$95 <br />$140 <br />$170 <br />$55 <br />Expenses - We do not charge for expenses such as survey equipment/vehicles, computers, cell phones/ <br />long distance calls, routine printing, postage and faxed documents. These expenses are included in our <br />hourly rates. We do charge for mileage at the approved IRS rates. <br />Page 6 <br />