Laserfiche WebLink
SECTION 1 - INTRODUCTION <br />A. PURPOSE <br />The purpose of this report is to update the City's Comprehensive Water Plan based on <br />current population and land use projections. The intent of this report is to incorporate key <br />components of past studies into one working document for future water utility planning. <br />B. PLANNING PERIOD <br />The City of Ramsey is projected to grow substantially over 20 years. For overall <br />planning purposes, population projections and water use estimates will be developed to <br />the end of year 2031. Infrastructure improvement plans will be developed to meet the <br />water utility needs over this planning period. <br />C. REPORT ORGANIZATION <br />This report is organized into seven sections as shown below. <br />Section 1: Introduction. <br />Section 2: Reviews projected water use demands based on anticipated population trends <br />and historical water use. <br />Section 3: Evaluates the existing major water system components. <br />Section 4: Evaluates water supply and treatment alternatives. <br />Section 5: Analyzes the distribution system and water storage alternatives. <br />Section 6: Provides an evaluation of Water Utility Fund. <br />Section 7: Summarizes recommendations and provides an implementation plan. <br />City of Ramsey, Minnesota — R13.104504 Page 1-1 <br />Comprehensive Water System Study Prepared by Bolton & Menk, Inc. <br />