My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sewer, which serves the City's Rum River District was designed for an average daily flow of 3.95 <br />mgd and consists of a 30-inch reinforced concrete pipe that has a capacity of 12.6 cfs or 8.14 <br />mgd. <br />On a local level, sewer planning will continue to be based on an ultimate daily flow of 7.87 rngd <br />which accommodates the entire City at full development. The 2030 MUSA at full development <br />has a projected flow of 4.867 mgd which is based on a population of 33,893. The projected 2031 <br />sewer service population is 25,828. Therefore, the 2030 MUSA will support a population of <br />8,065 or 2,987 residential units, greater than the projected 2031 population. <br />The 2011 sewer flow for the City is 0.800 mgd. Based on the development projections, the 2012 <br />to 2020 flow increase is 0.748 mgd for a total flow of 1.548 rngd. The 2012 to 2031 flow <br />increase is 1.793 mgd for a total flow of 2.593 mgd. This is about 68 percent of the currently <br />allocated flow allowance of 3.8 mgd. <br />D. PROPOSED SANITARY SEWER TRUNK EXTENSIONS <br />This Plan focuses on the proposed sanitary sewer trunk extensions and improvements which are <br />required to service all areas within the 2030 MUSA boundaries. In addition, the Special Area <br />along 167th Avenue which is proposed to be added to the MUSA is also addressed. This area is <br />indicated on the Map under Item H in the Appendix. The extensions to service the 2030 MUSA <br />are required in the following three areas and are shown on Figure 1 in the Appendix. <br />1. Subdistrict M3 located in the southwest corner of the City south of Highway 10. The <br />improvements consist of an 18-inch gravity crossing of Highway 10, lift station, <br />forcemain and trunk sewer extensions. <br />2. Subdistrict M4 located west of Armstrong Boulevard. The improvements consist of <br />gravity sewer extension along the extension of Bunker Lake Boulevard. <br />3. Subdistricts R21 through R25 located north of Trott Brook in the north central portion of <br />the City. Improvements in this area consist of gravity sewer extensions north of the <br />existing lift station in the Brookfield neighborhood to service the area west of CSAH 5. <br />The area east of CSAH 5 will require a lift station, forcemain and gravity sewer <br />City of Ramsey Page ES-4 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.