Laserfiche WebLink
It is recommended that this Plan be adopted by the City Council. The schedule for the trunk <br />system extensions is dependent on the rate and location of future growth. The implementation of <br />each individual sewer extension will require a feasibility study which will evaluate the extension <br />in more detail based on current information. <br />Initially the lift station/forcemain that will provide sewer service to the Special Area will be sized <br />only to serve the selected service area. In order to expand the MUSA to the northeast portion of <br />the City, capacity upgrades will be needed. <br />F. FINANCIAL IMPACT <br />The locations and sizing of the trunk sewer facilities shown on Figure 1 were use to develop an <br />approximate total cost for facilities required to service the 2030 MUSA and Special Area. The <br />total estimated cost for the extensions is $7,333,750. <br />The sanitary sewer utility expenses consist of operation and maintenance (0 & M) expenses in <br />addition to these system expansion and improvement costs. An additional expense is the balance <br />of $111,848 of reimbursement to Oakwood/21st Century Bank. The revenue sources consist of <br />usage fees and connection charges. The usage fees are intended to fully fund the 0 & M <br />expenses. The connection charge is intended to fund system expansion and improvements. <br />Several alternates were identified for the connection charge rate analysis. The variables in the <br />alternates were the options for providing sewer service to the Special Area and the equivalent <br />factor for high density residential units. Full reimbursement to Oakwood/21 st Century Bank was <br />included in all alternates. After reviewing the alternatives the City has chosen to establish the <br />connection charge that is summarized in Table ES.4. <br />City of Ramsey Page ES-6 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />