My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
projections, the projected average sanitary sewer flow increase is 0.748 mgd for 2012 to 2020 <br />and 1.793 mgd for 2012 to 2031. <br />I. SUMMARY <br />Table 2.4 provides a summary of the projected sanitary sewer flows for the 2012 to 2020 growth, <br />the 2012 to 2031 growth, the fully developed MUSA in both the Rum River and Mississippi <br />River Sewer Districts and the ultimate development of the entire City. <br />Description <br />Growth 2012 to 2020 <br />Growth 2012 to 2031 <br />Table 2.4 <br />Sanitary Sewer Flow Summary <br />Comm. / Ind. <br />Total Total Residential Other / Special Daily <br />Units Population Flow (mgd) Office/Mixed Use Flow (mgd) Flow (mgd) <br />Flow (mgd) <br />2,080 5,970 0.448 0.300 0.748 <br />4,940 14,394 1.080 0.713 1.793 <br />2030 MUSA - Rum River 9,989 26,970 2.023 0.117 0.062 2.202 <br />2030 MUSA - Miss. River 2,564 6,923 0.519 2.118 0.027 2.665 <br />Entire City - Rum River 17,383 46,934 3.520 0.143 0.164 3.827 <br />Entire City - Miss. River 7,437 20,080 1.506 2.205 0.030 3.741 <br />City of Ramsey Page 2-11 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.