My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 <br />RECOMMENDATIONS <br />A. GENERAL <br />Providing sanitary sewer service to the additional areas within the 2030 MUSA will require <br />extension of trunk sanitary sewer facilities to three general areas. The Special Area, if added to <br />the MUSA, will require a separate trunk extension. The Comprehensive Sanitary Sewer Plan <br />provides a guide plan for the location and sizing for the proposed extensions. <br />B. RECOMMENDATIONS <br />It is recommended that this Plan be adopted by the City Council. The schedule for the trunk <br />system extensions is dependent on the rate and location of future growth. The implementation of <br />each individual sewer extension will require a feasibility study which will evaluate the extension <br />in more detail based on current information. <br />The selection of the lift station/forcemain alternate for providing sewer service to the Special <br />Area will restrict future expansion of the MUSA in the northeast portion of City. Future capacity <br />upgrades will be needed to expand this service area. <br />C. FINANCIAL IMPACT <br />The locations and sizing of the trunk sewer facilities shown on Figure 1 were use to develop an <br />approximate total cost for facilities required to service the 2030 MUSA and Special Area. The <br />total estimated cost for the extension is $7,333,750. An analysis of the sewer connection charge <br />policy indicates that this cost plus the balance of the reimbursement to Oakwood/21st Century <br />Bank can be funded by connection charge revenue from the areas serviced by the extensions with <br />some surplus. Eliminating the projected surplus in revenue would allow reduction in the current <br />connection charge from $1,271 to $1,099 per unit. <br />The historic policy of requiring developer to fund sanitary sewer extensions with subsequent <br />City of Ramsey Page 6-1 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.