Laserfiche WebLink
ITEM <br />NO. <br />Alternate 2 - Lift Station and Forcemain <br />Northeast Sewer Extension <br />DESCRIPTION <br />EST. QTY. UNIT UNIT COST TOTAL <br />1 LIFT STATION 1 LS $350000 350,000 <br />2 DRIVEWAY 1 LS $5,000 $5,000 <br />3 DEWATERING 1 LS $5,000 $5,000 <br />4 8" DIP FORCEMAIN 10000 LF $35 $350,000 <br />5 VACUUM RELEASE MANHOLE 2 EA $8,000 $16,000 <br />6 FITTINGS 1540 LB $5 $7,700 <br />7 CLASS 5 AGGREGATE BASE 1000 TON $120 $20,000 <br />8 BITUMINOUS BASE COURSE 200 TON $80 $16,000 <br />9 BITUMINOUS WEARING COURSE 1200 SY $8 $9,600 <br />10 12" CMP APPROACH END CULVERTS 700 LF $30 $21,000 <br />11 CMP FLARED END SECTIONS 36 EA $250 $9,000 <br />12 SEED AND MULCH 7 ACRE $1,000 $7,000 <br />13 SILT FENCE 5000 LF $2 $10,000 <br />MOBILIZATION (5%) $41,315 <br />SOIL CORRECTION CONTINGENCY $37,800 <br />CONSTRUCTION COST $997,615 <br />SOFT COST (30%) $299,285 <br />TOTAL PROJECT COST $1,296,900* <br />*Land and easement acquisition costs are not included. <br />