Laserfiche WebLink
n. Proof of Authority. The CITY requires PERMITTEE to provide proof of <br />authority by its governing board to execute this Contract. This proof of authority <br />may be satisfied by providing the CITY with a certified copy of the minutes of <br />the governing board of PERMITTEE. <br />o. Recording of This Contract. See Section 17(d) above. <br />P- <br />q- <br />Violation of This Contract. If PERMITTEE fail to perform any of the terms of <br />this Contract, the CITY shall be entitled to recover, from PERMITTEE or the <br />issuer of its fmancial guarantee, the full amount of any and all fmancial <br />guarantees or withhold the Certificate of Occupancy as defined in Section 16(m) <br />above. Breach of any of the terms of this Contract by PERMITTEE shall be <br />grounds for denial of a building permit for any portion of the Property still owned <br />by PERMITTEE. <br />Contract Binding On Successors and Assigns. This Contract shall be binding <br />upon the parties, and their respective successors and assigns. <br />r. Letters of Credit. All letters of credit presented as a fmancial guarantee, if <br />required prior to issuance of a Certificate of Occupancy, shall be first approved as <br />to form and content prior to acceptance by the CITY. <br />18. Reauirements for Building Permit and Certificate of Occupancy. <br />a. No building permit for any lot in the Plat shall be issued until: (a) a Class 5 <br />driving surface is installed to within 300 feet of the proposed structure; (b) a <br />Certificate of Survey, including the survey information required by the CITY, has <br />been supplied to the CITY Building Official; (c) all the fmancial guarantees <br />required by the CITY have been satisfied; (d) a permit from the Lower Rum <br />River Watershed Management Organization has been obtained; (e) a permit from <br />Anoka County Soil Conservation District has been obtained (if necessary); and (f) <br />this Contract has been signed and received by the CITY. <br />b. No Certificate of Occupancy for any lot in the Plat shall be issued until: (a) <br />vehicular access to the lot is provided, including installation of at least one layer <br />of bituminous surfacing; (b) all utilities are in place, operational and accepted by <br />the CITY in accordance with this Agreement; (c) for lots that have a slope of less <br />than 2%, a certificate of grading, prepared by a licensed (State of Minnesota) <br />professional land surveyor, is provided to the CITY documenting that the flattest <br />grade on the lot is 1% or greater; and (d) boulevard sod and landscape tree, or <br />escrow for same, have been provided. <br />c. All improvements included in the Permittee Plans, including amendment required <br />of the City Staff Review Letter dated June 29, 2011, revised August 3, 2011 are <br />completed, or financial guarantee in the amount of 125% the City Engineer' s <br />estimate of the cost of said improvements is secured in the form of cash escrow or <br />letter of credit for the parking lot and related items. <br />STONEY RIVER <br />Development Contract <br />Page 7 of 13 <br />