My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/24/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 07/24/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:20:35 PM
Creation date
8/28/2012 3:41:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/24/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
certificate of grading, prepared by a licensed (State of Minnesota) professional land <br />surveyor, is provided to the CITY documenting that the flattest grade on the lot is 1% or <br />greater; and (d) boulevard sod and landscape tree, or escrow for same, have been <br />provided (e) all improvements included in the Permittee Plans, including amendment <br />required of the City Staff Review Letter dated June 29, 2011, revised August 3, 2011 are <br />completed, or financial guarantee in the amount of 125% the City Engineer's estimate of <br />the cost of said improvements is secured in the form of cash escrow or letter of credit. <br />SECTION IV <br />LANDSCAPING <br />12. Maintenance Guarantee for Landscaping. It is h <br />a maintenance guarantee to ensure the survival <br />accordance with the Landscape Plan prepar <br />Said maintenance guarantee shall consis <br />by the City, in the amount of <br />d that th <br />antings for th <br />date <br />of credit, app <br />Dollars <br />mittee shall provide <br />ect Property, in <br />as to form <br />d No Cents <br />($ .00) [# plantings ( trees, rubs) x cost/planting ($150/tree, <br />$75/shrub) x 30% average non ival rate], which shall be in effect for a two-year <br />period commencing on the date . • 's acceptance of saiiij plantings as part of the <br />Required Improvements. <br />At the end of the two-year period, the m. e g all be returned to the Permittee. <br />The determination tings that ha .een plante n accordance with the Site Plan have <br />either survived have replaced 11 be made by the Community Development <br />Department. <br />period, the City <br />letting contracts an <br />auth. 1. to dire t repl <br />P ittee hereb <br />er upon the Sit <br />13. Boulevard an <br />disturbed by th <br />event th <br />ermittee failo maintain the required plantings for a two-year <br />.1 may order the replac t of plantings with City day labor and/or by <br />upon the escrow • payment. Only the City Council shall have the <br />ent of the pl. ngs and withdraw from the escrow account. The <br />ission and a license to the City and/or its contractors and assigns to <br />placing plantings in the event of the Permittee default. <br />SECTION V <br />GENERAL <br />Restoration. The Permittee shall be responsible for restoring all areas <br />evelopment grading operation in accordance with the approved erosion and <br />sediment contro plan. The Permittee shall also be responsible for the cost of cleaning any soil, <br />earth or debris from the wetlands within and adjacent to this Site Plan resulting from grading or <br />other construction performed in the development of the land. <br />14. Construction Site Maintenance. The Permittee shall adhere to all City ordinances relating to, <br />but not limited to, dumping of garbage, site development, construction debris, open burning, etc. <br />Stoney River <br />Development Permit <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.