Laserfiche WebLink
Transportation System and Sunwood Drive Realignment <br />As part of the AUAR review, it was determined that only one (1) access on Armstrong Boulevard <br />between Highway 10and Ramsey Boulevard would be permitted, which was included in aJoint Powers <br />Agreement for regional , improvements. This had a dramaticeffect on the future built - <br />environment on the western edge of the development. <br />The transportation system capacity isa key element of the success of The COR. The City has reviewed <br />several iterations of land use scenarios that maximizingthe existing and planned transportation system <br />improvements. Improvements to Armstrong Boulevard and Highway 10 are key to the success of The <br />COR. <br />With the construction of the NorthstarCommuterRail— Ramsey Station underway, the internal capture <br />rate should assist in providingforacceptable levels of service on the transportation network. However, <br />future roadway improvements will still be necessary in ordertosupport the capacity of the <br />development. <br />City of Ramsey Comprehensive Plan Amendment -The COR Page 31 <br />