Laserfiche WebLink
1759 I (gh) Administration of the Mississippi River Critical Area. <br />1760 (1) Ir. tro'i when overlapping ctandar . art Frnrnt th. aty ocmal Ih.-22. s wlly <br />1761 th^ r:ecct ro:triot\•e standards. <br />1762 (21) No development or alteration of the Critical Area shall take place without <br />1763 complete compliance with this chapter. All permits for conditional uses, <br />1764 building, sewer system construction or extension (public or private), DNR and <br />1765 EQB review if applicable, and variances shall be obtained prior to any <br />1766 construction. Variances shall be issued only upon demonstration of hardship <br />1767 as defined by section 117-1. Failure to comply with all the standards and <br />1768 regulations of this chapter may be enjoined by the city council through proper <br />1769 legal channels. Each day a violation is permitted to exist shall constitute a <br />1770 separate offense. <br />1771 I (32) Notification procedures and certification. <br />1772 a. Certain land use decisions which directly affect the use of land within <br />1773 the Mississippi Critical River Area District and involve any adopting or <br />1774 amending an ordinance regulating the use of land including rezoning <br />1775 of particular tracts of the landof the following actions must be certified <br />1776 by the commissioner as specified in subsection (gh)(32)b of this <br />1777 section: <br />1778 1. Adopting or amending an ordinance regulating t!c LIIO of Iv' <br />1779 including rezonin-f y ra it&r trs,o i of the land. <br />1780 2. Granting a variance from a provision of this subdivision which <br />1781 related to the zoning dimension provision of subsection (a) of <br />1782 this section and any other zoning dimension provision: <br />1783 established in the Mississippi River Critical Area. <br />1784 3 Approving a ply/., VW. it with thc local land ucc <br />1785 code. <br />1786 /1. Granting a conditional ucc p.v rant for a p; iv�e. cz rcial <br />1787 recreational development. <br />1788 b. Certification process. <br />1789 1. A copy of all notices of any public hearings, or where a public <br />1790 hearing is not required, a copy of the application to consider <br />1791 I zoning amendments,, vas is cr plat: under <br />1792 this Code shall be sent so as to be received by the <br />1793 commissioner at least 30 days prior to such hearings or <br />1794 meetings to consider such actions. The notice of application <br />1795 shall include a copy of the proposed ordinances or <br />1796 amendment, or a copy of th prorosed inca���to�� rlat., or 1, <br />1797 description of thc requested variancc, or a copy of thc <br />1798 conditi.a 2. uio p`� rA ipOc tiom\ wherc applicable. <br />49 <br />