Laserfiche WebLink
TABLE I <br /> <br />TRUNK & SUBTRUNK SANITARY SEWER <br /> FOR <br /> THE INDUSTRIAL AREA <br /> <br />ESTIMATED COSTS <br /> <br /> Item <br /> <br />30" & 36" Reinforced Concrete Pipe (RCP) <br />Jack 36" RCP Under Sunfish Lake Blvd. <br /> <br /> 12" Subtrunk Sewer & Service Connections <br /> Total Estimated Construction Cost <br /> <br /> Engineering, Administration & <br /> Contingencies (30%) <br /> <br /> Right of Way Costs <br /> <br /> TOTAL ESTIMATED PROJECT COST <br /> Estimated Lateral Benefit (Subtrunk) <br /> <br /> NET TRUNK COST <br /> <br />Estimated Cost <br /> <br /> $416,600 <br /> <br /> 15,000 <br /> <br /> 89~150 <br />$520,750 <br /> <br />156,225 <br />40L525 <br />$717,500 <br />47z300 <br />$670,200 <br /> <br /> TABLE II <br /> MUNICIPAL WELL NO. 2 <br /> <br /> ESTIMATED COSTS <br /> <br /> Item <br /> <br />Ironton - Galesville Well <br /> <br />Pumps, Piping & Controls <br /> <br /> Total Estimated Construction Cost <br /> <br /> Engineering, Administration & <br /> Contingencies (30%) <br /> <br /> TOTAL ESTIMATED PROJECT COST <br /> <br />E~timated Costs <br /> <br /> $50,000 <br /> <br /> 30.~000 <br /> $80,000 <br /> <br /> $24,000 <br />$104,000 <br /> <br /> <br />