Laserfiche WebLink
Public Works Committee 5. 8. <br />Meeting Date: 09/18/2012 <br />By: Shane Nelson, Engineering/Public <br />Works <br />Title: <br />Sunwood Drive Project - Supplemental Agreement #1, Change Order #2 and Connexus Relocation Charges <br />Background: <br />Supplemental Agreement #1 <br />The City Council previously approved the construction contract for City Project 12-20. This supplemental <br />agreement addresses two items that were included in the original design, as follows: <br />Trail Width - The original plans included a 8' bituminous trail along the east side of Armstrong Blvd. For <br />maintenance purposes, the City has determined that all trails should be 10' wide. <br />Drainage Along Armstrong - During the construction it was discovered that there is an elevation conflict between <br />the two sets of plans. Essentially, the plans for Armstrong designed the east boulevard to existing ground. The <br />design for Sunwood Drive and the COR TWO retail area depicted mass grading east of Armstrong to prepare the <br />building sites for the COR TWO retail area. This resulted in approximately a 4 to 6 foot conflict in elevations, and <br />created a drainage concern. Due to the mass grading, one catchbasin cannot be used as the depth is incorrect and <br />there is no practical way to direct stormwater to that location when taking into consideration the COR TWO plat. <br />After several design concepts and iterations, it was determined that the most feasible solution is extending the curb <br />to the south 126' to prevent the runoff from Armstrong Blvd from sheet flowing onto the proposed parking area in <br />the COR TWO. <br />The estimated cost increase associated with Supplemental Agreement #1 is $5,001. <br />Change Order #2 <br />This Change Order is associated with the large diameter outlet pipe from the North Commons project area to the <br />newly excavated Lake Ramsey. Currently, the storm sewer is stubbed and is directly below the right turn lane on <br />Bunker Lake Blvd. Extending the pipe will consist of lane closures on Bunker Lake Blvd, dewatering, installing a <br />108" diameter manhole, installing 210 LF of 73" Arch Pipe, bituminous patching, and other miscellaneous work. It <br />will also be necessary to lower an existing watermain that will conflict with the storm sewer. The estimated cost of <br />Change Order #2 is $184,114. <br />Connexus Relocation Charges <br />We were recently informed by the development manager that the electric cabinet recently <br />installed by Connexus is in a location that will obscure the proposed development signage for the COR TWO and <br />must be relocated. The current location was well communicated by all parties at several weekly construction <br />meetings. However, the attendees at the weekly construction meetings did not have knowledge that this same issue <br />was discussed approximately one year earlier. The Development Manager has provided information showing that <br />approved locations for cabinets had been provided to Connexus in 2011. Connexus has responded indicating that <br />some alignments have changed and there were more recent communications regarding the cabinet locations. The <br />estimated cost provided by Connexus to relocate the cabinet is $10,620. <br />Notification: <br />Tom Keller from Connexus was notified and invited to attend <br />Observations: <br />