My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 09/18/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 09/18/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:31:25 AM
Creation date
9/17/2012 8:52:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
09/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />Lake Ramsey Area <br />Storm Sewer Inventory <br />Salvagable Material <br />Description <br />36" Flared End Section <br />72" Top Slab -w/ 27" Opening <br />48" Top Slab -w/ 2' x 3' Opening <br />72" Top Slab -w/ 2' x 3' Opening <br />36" Grate <br />24" Flared End Section w/ Safety Grate <br />24" Section of Concrete Pipe <br />96" Dia. x 12" MH Riser <br />18" Riser for 2' x 3' Catch Basin <br />36"x 60" HDPE Pipe Reducer <br />20' Long - 4" Ductile Iron Pipe <br />1' x 24' x 1/2" Piece of Steel <br />20' Long - 30" HDPE Pipe <br />Water Valve Extensions <br />48" Section of Concrete Pipe <br />60" Section of Concrete Pipe <br />9' Diameter Concrete MH Structures - 7' High <br />11' Diameter Bottom Slabs <br />11' Diameter Top Slabs w/ 2' x 3' opening <br />Quantity <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />2 <br />1 <br />1 <br />6 <br />4 <br />1 <br />2 <br />2 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.