Laserfiche WebLink
❑ a Liital 1 II 1 Ein ❑e❑ent Progra❑ <br />❑ it❑ o❑ ❑a❑ se 1 1 1 1 innesota <br />Pro @Ct0 06EP❑1111130011 <br />Pro @ct0a0e ❑edeLi1o❑❑ ent o❑❑entral Par <br />❑ <br />❑escri Cition <br />The drive to the Park Center building would be extended to connect to Yolite Street and the proposed land use of the 35 acres east of the park. <br />This project is being divided into two projects. For 2012 this consists of the extension of the parkway and outlet to the east. Projected for 2014 <br />will be the installation of curbing and removal of the post and cable vehicle barriers around the parking lots. The cost of the 2012 program is <br />$275,000. <br />C�tsti Lication <br />Additional parking would occur along this new one way drive parkway, and some parking may be considered where the underutilized <br />sedimentation basin currently exists, or this basin may be used for the adjoining land use, with the new parking occurring to the east. <br />Revised 10/2011 <br />❑ menditures <br />Improvements Other than Build 275,000 500,000 775,000 <br />Funding Sources <br />Total <br />Park Improvement Trust Fund <br />Youth Association <br />Total <br />275,000 <br />2012 thru 2016 <br />DeLart0 ent Park Improvements <br />lontact <br />T Ole Improvement <br />0se411 OiEe 20 Years <br />OategorE Park Improvement <br />PrioritE 6- Planned <br />Status Active <br />Total Pro@ct OostC 0055000 <br />2012 2013 2014 2015 2016 Total <br />500,000 775,000 <br />2012 2013 2014 2015 2016 Total <br />275,000 250,000 525,000 <br />250,000 250,000 <br />275,000 500,000 775,000 <br />PAGE 119 <br />