My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/04/2012
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2012
>
Agenda - Planning Commission - 10/04/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:11:47 AM
Creation date
10/1/2012 10:32:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/04/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northgate Performing Arts Center: Site Plan Review <br />September 28, 2012 <br />Page 4 of 7 <br />• Require proof of parking to be installed with Phase 1 due to lack of legally recordable shared <br />parking agreements to meet requirements of the COR Design Framework. <br />• Provide City with legally recordable shared cross -parking agreement. <br />• Accept proof of parking plan with a condition that at such time that parking demand is beyond <br />what is provided on -site and the 25 accepted on -street parking stalls, and extending into <br />additional on -street parking areas beyond 300' radius of the site, such proof of parking shall be <br />installed at the applicants expense. <br />In addition, while this site plan review and Conditional Use Permit request does not include <br />approvals for Phase 2 construction, it is apparent that the site will be under parked as the Phase 2 <br />addition will be located upon the proof of parking area. While this review is based on the merits <br />of the current application Staff will recommend a condition that Phase 2 cannot move forward <br />without recordable cross -parking agreements. <br />Signs: Please note that all signs for the proposed building must be approved through a separate <br />sign permit process. <br />Lighting: City standards require that the luminaire (light source) must not be visible from <br />beyond the property line. The submittal includes a lighting plan however, a photometric plan <br />shall be submitted prior to execution of the Development Permit. Any lighting used to illuminate <br />an off-street parking area, sign, or structure shall be arranged to deflect away from Sunwood <br />Drive and Peridot Street NW. <br />Landscaping Plan: The following comments are offered regarding the September 4, 2012 <br />Landscaping Plan: <br />Minimum landscaping is provided to meet requirements. <br />• The Planting Notes should include the following: <br />o Planting depth shall be such that the first set of primary roots is at finished grade. <br />o Remove twine, wiring, ropes and burlap from top and sides of root ball. <br />o At time of planting, only prune out dead or damaged branches. All necessary <br />pruning cuts shall be made just outside of branch collar area. <br />o Remove all tags and labels. <br />o Wood chip mulch shall not be piled against the trunk of trees. <br />• A two (2) year maintenance guarantee is required on all landscaping after initial <br />acceptance by the City. <br />• Topsoil, whether it is trucked in or the existing topsoil is amended, must meet or exceed <br />MN DOT's Premium Topsoil specification. <br />• At the time of installation, all shrubs must be at least twenty-four (24) inches in size. <br />Please submit a revised landscaping plan prior to execution of the Development Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.