Laserfiche WebLink
Review File: Lake Region RV <br />Conditional Use Permit/Site Plan Review <br />September 28, 2012 <br />Page 5 of 6 <br />Tree Preservation: The site does have a few scattered trees, but the tree cover consists primarily of <br />green ash and Siberian elm, neither species is desirable, the former due to concerns with emerald ash <br />borer and the latter is an invasive species that warrants removal. Therefore, a tree preservation plan is not <br />needed for this project. <br />Civil Engineering Review <br />Reviewer: Leonard Linton <br />llinton(i ci. ramsev.mn. us <br />Grading and Drainage: The following comments are offered regarding the September 4, 2012 Grading <br />and Utility Plans: <br />• The B612 concrete curb detail should be amended to include base material extending to 1' <br />beyond the back of curb. The pedestrian ramp details have recently been modified at the state <br />level. The plans must be revised to include the most recent MN/DOT approved details and <br />design. <br />• Spot elevations must be called out as gutter or top of curb. <br />• The developer will be responsible for replacing any sidewalk or streetscape along Sunwood <br />Drive that is damaged by construction of the building. <br />• A pedestrian detour plan must be submitted showing the pedestrian route along Sunwood Drive <br />during construction of the building. <br />The project will require a permit from the Lower Rum River Water Management Organization <br />(LRRWMO). Please copy the City on the submittal. The application deadline is the first Thursday of the <br />month for the meeting on the third Thursday of the month. The LRRWMO requirements include <br />infiltration of 1 inch of runoff from the site. Infiltration practices must be incorporated into the plans to <br />meet this requirement. Please submit calculations routing the site runoff to the infiltration basin for the 1" <br />10 year and 100 year storms. <br />The following notes should be added or amended on the plan set: <br />• The contractor should have a sweeper on site or available within 3 hours. All material tracked <br />onto City streets must be removed immediately upon discovery, or as directed by the City <br />Engineer. <br />• Installation of silt fence and other down gradient sediment protection measures shall be <br />completed and inspected prior to commencement of any site activities. <br />A maintenance agreement for the underground stormwater treatment system must be submitted. <br />Street and Building Access: One additional access point is being proposed for Lot 1, Block 3, ALPACA <br />ESTATES. The access plan appears to be adequate. <br />Permits: The applicant is responsible to secure all required permits for this project; including but not <br />limited to an MPCA NPDES construction permit, a Lower Rum River Watershed Organization permit, <br />and Anoka County and MnDOT right-of-way permits. Additionally, the contractor performing the work <br />will be required to obtain a City license and right-of-way permit. <br />