My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/09/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 10/09/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:30 PM
Creation date
10/4/2012 3:47:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/09/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 2. <br />Meeting Date: 10/09/2012 <br />By: Shane Nelson, Engineering /Public <br />Works <br />Title: <br />Sunwood Drive / Armstrong Blvd - Consider Change Order #3 <br />Background: <br />The City Council previously approved the construction contract for City Project 12 -20. The original plans included <br />an access drive to serve the existing retail area (Coborn's, Aculpulco, etc.) that traverses across the COR TWO <br />development area to re- establish access to Northstar Marketplace. <br />The original plans also included sanitary sewer and watermain stubs as well as a run of storm sewer to drain the <br />COR TWO site area until development occurs. The strorm sewer, watermain stubs, and sanitary sewer stubs are <br />incorporated into the Site Plan design for the COR TWO retail area. <br />Notification: <br />N/A <br />Observations: <br />The proposed Change Order includes an ADA concrete crosswalk at the access drive, which was not included in the <br />original design. This crosswalk now serves the public trail easement connecting Sunwood drive to the future <br />pedestrian underpass at Armstrong. This change order also includes storm sewer modifications in the <br />COR TWO retail area that Landform has identified to be required based on the most current revisions to the <br />approved Site Plans based on revisions required to meed LRRWMO comments. The Change Order also addresses <br />other minor storm sewer and curb alignment revisions on Sunwood Drive that were identified during construction. <br />The cost provided by North Pine Aggregate for Change Order #3 is an increase of $23,559.72. <br />Recommendation: <br />We recommend approval of Change Order #3 <br />Funding Source: <br />The funding sources of this project have been previously identified. A portion of the costs that are associated with <br />the COR TWO plat will be allocated to the HRA. The Development Manager and engineering staff will prepare a <br />comprehensive allocation of costs based on actual bid prices and work effort and present it to the City Council and <br />HRA at a future date. Some of these revisions will result in reductions in the HRA costs associated with the retail <br />project, as items are being moved to this contract for greater efficiency in construction. The funding source for the <br />cost overage that is associated with Sunwood Drive will be the equipment revolving fund. <br />Council Action: <br />Motion to approve Change Order #3 <br />Narrative and Pricing <br />Revised Plan Sheets <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.