Laserfiche WebLink
Project Name: <br />Project Location: <br />NORTH PINE <br />AGGREGATE INC. <br />14551 Lake Drive I Forest lake, MN 55025 1 651,464,6802 <br />To: City Of Ramsey <br />Address; 7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />y < <br />CSAH 83 & 147th Ave Change Order //3 <br />Existing Sunwood Drive & Access Drive, Ramsey, MN <br />A. Alternate 3 <br />1 Remove Existing 2x3 Catch Basin <br />2 Remove Curb & Gutter <br />3 Remove Concrete Crosswalk <br />4 Remove Bituminous Pavement <br />7 15" RC Pipe Sewer Design 3006 Class IV <br />8 Connect To Existing Storm Structure <br />.10 Construct Drainage Structure 2x3 Box <br />11 Construct Drainage Structure DES 48 -1020 <br />12 Casting Assembly <br />13 Install Casting <br />14 4" Concrete Sidewalk <br />-4 15 8612 Curb & Gutter <br />16 8" Concrete Pavement <br />.+17 B618 Curb & Gutter <br />Contact: <br />Phone: (763) 427 -1410 <br />Fax: (763) 427-5543 <br />Bid Number: 12 -079 <br />Bid Date: 9/21/2012 <br />I Item # Item Description <br />Estimated Quantity Unit Unit Price Total Price <br />1,00 EACH <br />32.00 LF <br />84.00 SF <br />60.00 SY <br />69.00 LF <br />1.00 EACH <br />1.00 EACH <br />1.00 EACH <br />1.00 EACH <br />2.00 EACH <br />167.00 SF <br />32.00 LF <br />90.00 SY' <br />67.00 LF <br />B. Contract Deduct <br />1 Aggregate Base (CV) Class 5 Modified 2.56 CY ($20.75) ($53,12) <br />2 Type SP 12,5 Wearing Course Mix (4,C) 2.09 TON ($64.85) ($135.54) <br />3 Type 12,5 Non Wear Course Mix (4,B) 3.48 TON ($62,75) ($218.37) <br />4 18" RC Pipe Sewer Design 3006 Class IV 32.00 LF ($30,00) ($960.00) <br />Total Price for above B. Contract Deduct Items: ($1,367.03) <br />Notes: <br />• Price does not include: Clearing & Grubbing; Site Surveying; Soil Testing; Gravel or Bituminous; Building or Structure Demolition; Hidden or Buried <br />Debris; Hazardous Materials Removal; Dewatering; Import and /or Export of Dirt; Site Utilities other than those listed above; Moving of Small <br />Utilities; Any Subsoil Corrections or Trench Borrow; Traffic Control; <br />• Pricing is based on the engineer(s) plans dated: Change Order #3 dated 9/14/12, shts 4AR, 22AR,25AR,26AR,34AR,26R,4BR <br />• Proposal is valid for a period of 30 days from date of proposal. <br />o Any delays due to incomplete surveying or improper surveying could result in additional charges. <br />o Price does not include lowering /moving small utilities, If there are utilities not properly represented on plans, price is subject to change. <br />• All grading needs to be verified by civil engineer as grading is completed. <br />Payment Terms: <br />Net due upon receipt of billing, A 1.5% per month service charge will be assessed on unpaid balance. <br />$365.00 <br />. $1.40 <br />$1.80 <br />$2.45 <br />$33.00 <br />$2,625.00 <br />$1,500.00 <br />$1,600.00 <br />$750,00 <br />$150.00 <br />$31.05 <br />$30,60 <br />$76.50 <br />$31.60 <br />Total Price for above A. Alternate 3 Items: <br />$365.00 <br />$44.80 <br />$151,20 <br />$147.00 <br />$2,277.00 <br />$2,625.00 <br />$1,500.00 <br />$1,600.00 <br />$750.00 <br />$300.00 <br />$5,185,35 <br />$979.20 <br />$6,885.00 <br />$2,117.20 <br />$24,926.75 <br />9/21/2012 5:00:46 AM Page 1 of 2 <br />