Laserfiche WebLink
CC Work Session 2. 3. <br />Meeting Date: 10/09/2012 <br />By: <br />Shane Nelson, Engineering /Public <br />Works <br />Title: <br />Sunwood Drive Project - Consider Additional Electrical Receptacles <br />Background: <br />The City Council previously approved the construction contract for City Project 12 -20. Concurrent with the <br />construction, the City approved a proposal from Connexus to move / install street light fixtures (including <br />upgrading with LED components), power to the center of the roundabout and for installing 33 duplex receptacles at <br />tree locations. <br />Notification: <br />N/A <br />Observations: <br />While evaluating the receptacles and their locations, we identified that the construction contract calls for 53 new <br />boulevard trees. Further, City staff also identified several existing trees west of Zeolite Avenue that do not have <br />receptacles. <br />It appears that the intent for providing receptacles is to provide one receptacle at every tree location, therefore we <br />asked Connexus to provide a cost for installing additional receptacles. The installation of the additional receptacles <br />will require the installation of a transformer as well as some directional drilling in the areas that have existing <br />sidewalk and streetscape. <br />If the City is interested in having one receptacle at every tree location, the timing is favorable. The estimated cost <br />associated with providing the additional 27 electrical receptacles is $28,760. <br />If the receptacles are installed at a future date, the cost will likely increase as additional restoration work will be <br />required that will not be required now if done with this project. <br />Recommendation: <br />We would recommend approval of the proposal from Connexus Energy if the intent is to have one receptacle at <br />every tree location. <br />Funding Source: <br />The funding source is the Street Light Utility fund. <br />Council Action: <br />Motion to approve the proposal from Connexus Energy with an estimated cost of $28,760. <br />Connexus Proposal <br />Original Proposal <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />