My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 10/09/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 10/09/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:30 PM
Creation date
10/4/2012 3:47:59 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
10/09/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 3. <br />Meeting Date: 10/09/2012 <br />By: <br />Shane Nelson, Engineering /Public <br />Works <br />Title: <br />Sunwood Drive Project - Consider Additional Electrical Receptacles <br />Background: <br />The City Council previously approved the construction contract for City Project 12 -20. Concurrent with the <br />construction, the City approved a proposal from Connexus to move / install street light fixtures (including <br />upgrading with LED components), power to the center of the roundabout and for installing 33 duplex receptacles at <br />tree locations. <br />Notification: <br />N/A <br />Observations: <br />While evaluating the receptacles and their locations, we identified that the construction contract calls for 53 new <br />boulevard trees. Further, City staff also identified several existing trees west of Zeolite Avenue that do not have <br />receptacles. <br />It appears that the intent for providing receptacles is to provide one receptacle at every tree location, therefore we <br />asked Connexus to provide a cost for installing additional receptacles. The installation of the additional receptacles <br />will require the installation of a transformer as well as some directional drilling in the areas that have existing <br />sidewalk and streetscape. <br />If the City is interested in having one receptacle at every tree location, the timing is favorable. The estimated cost <br />associated with providing the additional 27 electrical receptacles is $28,760. <br />If the receptacles are installed at a future date, the cost will likely increase as additional restoration work will be <br />required that will not be required now if done with this project. <br />Recommendation: <br />We would recommend approval of the proposal from Connexus Energy if the intent is to have one receptacle at <br />every tree location. <br />Funding Source: <br />The funding source is the Street Light Utility fund. <br />Council Action: <br />Motion to approve the proposal from Connexus Energy with an estimated cost of $28,760. <br />Connexus Proposal <br />Original Proposal <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.