My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/09/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:19 PM
Creation date
10/4/2012 4:16:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: 10/09/2012 <br />By: Shane Nelson, Engineering/Public <br />Works <br />Information <br />Title: <br />Approve Change Order #3 for Sunwood Drive Project <br />4. 7. <br />Background: <br />The City Council previously approved the construction contract for City Project 12-20. The original plans included <br />an access drive to serve the existing retail area (Coborn's, Aculpulco, etc.) that traverses across the COR TWO <br />development area. <br />The original plans also included sanitary sewer and watermain stubs as well as a run of storm sewer to drain the <br />COR TWO site area until development occurs. The strorm sewer, watermain stubs, and sanitary sewer stubs are <br />incorporated into the Site Plan design for the COR TWO retail area. <br />Notification: <br />N/A <br />Observations: <br />The proposed Change Order includes an ADA concrete crosswalk at the access drive, which was not included in the <br />original design. It also includes storm sewer modifications in the COR TWO retail area that Landform has identified <br />to be required based on the most current revisions of the Site Plans. The Change Order also addresses other minor <br />storm sewer and curb alignment revisions on Sunwood Drive that were identified during construction. <br />The cost provided by North Pine Aggregate for Change Order #3 is an increase of $23,559.72. <br />Recommendation: <br />We recommend approval of Change Order #3 <br />Funding Source: <br />The funding sources of this project have been previously identified. A portion of the costs that are associated with <br />the COR TWO plat will be allocated to the HRA. The Development Manager and engineering staff will prepare a <br />comprehensive allocation of costs based on actual bid prices and work effort and present it to the City Council and <br />HRA at a future date. <br />Council Action: <br />Motion to approve Change Order #3 <br />Attachments <br />Revised Plan Sheets <br />Narrative and Pricing <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 10/04/2012 08:22 AM <br />Form Started By: Shane Nelson Started On: 10/03/2012 12:51 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.